Objective:

The IT Security Operation Checklist provides guidelines for IT professionals to perform the daily, weekly, and monthly maintenance and administrative tasks required to keep your infrastructure components and application systems performing optimally. In addition, a checklist is available to help IT to prepare for disaster recovery efforts,  and it helps to keep an IT system operation smoothly. The checklist divides into three sections: 1) IT Infrastructure Components Security Operation Schedule, 2) Servers Backup Operation Log, 3) MFGPRO ERP Operation Log. Take reference to the following checklists as a sample, or adapt them to suit your company’s specific needs.

1. IT Infrastructure Components Security Operation Schedule

IT Infrastructure Components Security Operation Schedule Verion 1.0
Author: Goldman
Date: 18 Feb2005
Note 1 :
Executor should sign-off with date after process.
Note 2 : “U” – un-process or cancel to process; {Blank} – planning to process, “X” – processed
Schedule Subject Target Tool Executor Report Record Baseline
Week-Day Configuration & Patch H/W & S/W Inventory List Update Goldman Inventory List (In case of update) Log Db Y
Server Password List Update Goldman Password List (in case of update) Safety Box Y
Ad-Hoc Win Hot-Fixes & Virus Update Goldman Alert Report (In case of incident) Log Db Y
Incident&Response Instruction Detection Analysis Snort Goldman Snort Report (in case of incident) Log Db
In case of HW/SW/Network Incident Roman Alert Report (In case of incident) Log Db
Weekly Configuration & Patch Ad-Hoc Win Hot-Fixes, Patch & Virus Update Reeve Alert Report (In case of incident) Log Db
Security Assessment Instruction Detection Analysis Snort Goldman Snort Report (in case of incident) Log Db
Review Firewall Log File Cisco Firewall Goldman Alert Report (in case of incident) Log Db
Off-Site Backup Off-Site Backup Tape Delivery Goldman
Monthly Configuration & Patch Win Patch Verification & Status Report Vendor Web Site Goldman Alert Report (In case of incident) Log Db
Win Virus DAT Verification & Status Report kix Goldman Alert Report (In case of incident) Log Db
Review ux3 UNIX Log File (sulog,aset, passwd) Goldman
Review ux2 UNIX Log File (sulog,aset, passwd) Goldman
Review Hyperion UNIX Log File (sulog,aset, passwd) Goldman
Review Linux Log File (sulog,aset, passwd) Goldman
Review hysl Server log (Application, Security & System Log) Goldman
Review hyweb Server log (Application, Security & System Log) Goldman
Review hyrpt Server log (Application, Security & System Log) Goldman
Review ms032 Server log (Application, Security & System Log) Goldman
Review ms002 Server log (Application, Security & System Log) Goldman
Review ms044 Server log (Application, Security & System Log) Goldman
Bi-Monthly Configuration & Patch UNIX Patch Status Report Vendor Web Site Goldman Log Db
Monthly Security Assessment Network H/W Scanning Nessus Goldman Nessus Report Linux
Instruction Detection Snort Goldman Snort Report Linux
Password Cracking Unix Password Cracking (MFG/PRO) John the Ripper Goldman JTR Report Log DB
Unix Password Cracking (Hyperion) John the Ripper Goldman JTR Report Log DB
Window Password Cracking LC4 Goldman LC4 Report Linux
Printer Setting Printer Security Check Goldman Excel(Result) Log DB
Excel(Password Information) Safety Box Y
Annually Security Assessment War-Dialing PhoneSweep-SCAN Goldman PhoneSweep-SCAN Report Log DB
Annually DRP MFG/PRO DRP Test Drill MFG/PRO Goldman DRP Report Log DB
Servers Capacity Plan Servers Capacity Plan (cover all servers) Goldman Capacity Plan Report

2. Servers Backup Operation Log

Servers Backup Operation Log Verion 1.0
Author: Goldman
Date: 18 Feb2005
Note 1 :
Executor should sign-off with date after process.Note 2 :
“X” – processed;
U – un-process or cancel to process; {Blank} – planning to process, Year 2005         Week #
Schedule Subject Target Tool Executor Day 1 2 3 4 5
Daily UNIX & Window Servers Data Backup MFG/PRO Life Data (hkhkgclux3) tar (DDS3) Goldman Mon
Tue
Wed
Thu
Fri
Hyperion Life Data (hy-ess) tar (sDTL) Goldman Mon
Tue
Wed
Thu
Fri
Hyperion RDBMS Data (hysl) Export to Hy-Web for backup Goldman Mon
Tue
Wed
Thu
Fri
Hyperion web Server (hy-web) Arcserve (LTD2) Goldman Mon
Tue
Wed
Thu
Fri
Hyperion report Server (hy-rpt) Arcserve (LTD2) Goldman Mon
Tue
Wed
Thu
Fri
Target Tool Executor Day\week 1 2 3 4 5
File & Print Server (hkhhkglco8ms032) Veritas (DTL4) Goldman Mon
Tue
Wed
Thu
Fri
File & Print Server (hkhhkglco8ms002) Veritas (DTL4) Goldman Mon
Tue
Wed
Thu
Fri
File & Print & microsoft Server (hkhhkglco8ms044) Veritas (DTL4) Goldman Mon
Tue
Wed
Thu
Fri
Weekly UNIX Data Backup MFG/PRO Testing Data (hkhkgclux2) tar (DDS3) Goldman
Monthly UNIX & Window Servers Full/OS Backup MFG/PRO Production Machine (hkhkglcux3) ufsdump (DDS3) Goldman
Hyperion Essbase Production Machine (hy-ess) ufsdump (sDTL) Goldman
MFG/PRO Testing Machine (hkhkglcux2) ufsdump (DDS3) Goldman
DNS & SMTP Server (hkhkglcp2) Nil  (backup device not available)
Linux Machine Ghost image saved in hkhhkglco8ms044/D$/images/linux Goldman
CAD5 Svr Nil  (backup device not available)
ProIntralink Svr Nil  (backup device not available)
Hyperion Analyzer + Planning Server (hysl) Arcserve (LTD2) Goldman
Hyperion web Server (hy-web) Arcserve (LTD2) Goldman
Hyperion report Server (hy-rpt) Arcserve (LTD2) Goldman
File & Print + Distiller Srvs (hkhhkglco8ms032) Veritas (DTL4) Goldman
File & Print Srvs (hkhhkglco8ms002) Veritas (DTL4) Goldman
File & Print + Microsoft SUS Srvs (hkhhkglco8ms044) Veritas (DTL4) Goldman
HRIS (hkhhkglch8rc001) Ghost Goldman
Sec W2k Server (hkhhkglco8ms040) Ghost Goldman
Critix + BDC (hkhhkglco8ms001) Ghost Goldman
Oracle 8.1 Server (hkhhkglcf8ms002) Ghost Goldman
Notes 4.6.5 Svr (hkg04) Ghost Goldman
Notes 5.05 development Svr (hkgdev01) Ghost Goldman
Notes 4.65. Svr (hkg02) Ghost Goldman

3. MFGPRO ERP Operation Log

MFGPRO ERP Operation Log Verion 1.0
Author: Goldman
Date: 18 Feb2005
Note 1 :
Executor should sign-off with date after process.
Note 2 : “U” – un-process or cancel to process; {Blank} – planning to process, “X” – processed Year 2005           Week #
Schedule Subject Executor Follow-up Action Record Day 1 2 3 4 5
Every
Week-Day
MFG/PRO Life Data Backup Monitoring Goldman Take follow-up action in case of error IT HelpDesk Db Mon
Tue
Wed
Thu
Fri
EDI Import/Export OR & IV Monitoring Goldman Take follow-up action in case of error IT HelpDesk Db Mon
Tue
Wed
Thu
Fri
Daily Batch Job Monitoring Goldman Take follow-up action in case of error IT HelpDesk Db Mon
Tue
Wed
Thu
Fri
Weekly MFG/PRO Testing Data Backup Monitoring Goldman Take follow-up action in case of error IT HelpDesk Db
Weekly Batch Job Monitoring Goldman Take follow-up action in case of error IT HelpDesk Db
Off-site backup delivery Goldman Update Log Sheet Log Sheet
Proform the EDI Import for RA01/RA02/IV01 Goldman Email report to end-users Email
Monthly O/S & DataBase Performance Analysis Goldman Take follow-up action in case of error IT HelpDesk Db
Arhive & Backup GL, Inv, WO & Operation Txn Data Goldman Update Log Sheet Log Sheet
Backup archive Data
(/eisa/mo, /mfgproce/edimsg, /tmp1)
Goldman Update Log Sheet Log Sheet
Erase archive Data  after Backup
(/eisa/mo, /mfgproce/edimsg, /tmp1)
Goldman Update Log Sheet Log Sheet
Phiger Export Data Monitoring Goldman Take follow-up action in case of error IT HelpDesk Db
FnA month-end operation support Goldman Take follow-up action in case of error IT HelpDesk Db
Annually Arhive & Backup GL consolidation/PO/SO Data Goldman Update Log Sheet Log Sheet
FnA Year-End operation support Goldman Take follow-up action in case of error IT HelpDesk Db